Search the Knowledge Base Report a bug
Post new topic   Reply to topic   printer-friendly view   .    ArchiCAD-Talk Forum Index >>> Schedules >>> Scheduling the volume of wall "demolished" by a New Window
View previous topic :: View next topic
Author Message
B.E.A.T.
Junior member
Junior member

Joined: 02 Aug 2012
Posts: 66
Location: Ghent, Belgium

PostPosted: Thu Apr 27, 2017 2:23 pm    Post subject: Scheduling the volume of wall "demolished" by a Ne Reply with quote

When I insert an "New" window into an "Existing" wall (using Renovation Tool), the whole created in the wall, is nicely displayed in a view of the demolished elements (e.g. in a red color).

Strangely enough the volume of the wall, that has to be "removed" to be able insert the room in real life, doesn't come up in the Schedule.

I Schedule walls, Renovation Status = To Be Demolished, the window is large enough, so any calculation rules for conditional volume don't apply...

is this a limitation of Renovation Tool?

_________________
(,)_\,,/

www.offbeat.be
Archicad 21 BE
Back to top
View user's profile Send private message    
Display posts from previous:   
View previous topic :: View next topic
Post new topic   Reply to topic   printer-friendly view       ArchiCAD-Talk Forum Index >>> Schedules >>> Scheduling the volume of wall "demolished" by a New Window All times are GMT + 1 Hour
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You cannot download files in this forum


Powered by phpBB 2001, 2005 phpBB Group
Copyright 2012 - Graphisoft SE. All rights reserved worldwide. Terms of Use | Privacy Policy