By kzaremba
#298273
Barry Kelly wrote:
Thu May 30, 2019 2:11 am
kzaremba wrote:
Wed May 29, 2019 3:07 pm
However, since it's the expression you cant sum it up in schedule... even if I left it as number value.... proc num column on attachment.
'proc num' column has totalled correctly.

Barry.
Sure Sum did but I meant value in the cell. The proc num shows the only ratio between single apartment to the overall area - so quite useless. I'd expected to sum hole type of apartments. (if you sum up cells in this column you get 29,28).
User avatar
By Barry Kelly
#298279
You have multiple elements with the same 'proc num' result.
Because they are not unique, they show the same figure but the total is correct.

(1 x 5.44) + (6 x 9.67) + (2 x 5.90) +(3 x 8.27) = 100.07

In the scheme settings try turning on the 'flag' icon next to the 'proc num' field.
You should then see sub totals - I hope.

NOTE: this does not work for area, length, width fields, as these do sum as you are wanting them to (which I think is wrong).
But your field is not a true area, length or width so it should work.

Barry.