- Mon Jan 11, 2021 6:38 pm
#320968
I have walls inside of hotlinks inside of hotlinks which I do not want them to clean intersect at the final plan.
These would be walls which I do not want to clean intersect with fire rated partitions. I want the fire partition to look unbroken. I do not want the unrated intersecting walls to intersect as I want the plane of the gypsum of the fire wall to run past the connecting wall.
How do I control this when I have walls inside of hotlinks? I know about use of layer sets to save my layer priorities. Yet how to I have walls in my hotlinks on the same layer as my final plan which some are to clean up and others are not to clean up?
I have bathroom walls in a unit which I do not want to clean and I have walls for the corridor I want to clean with demising walls in the plans which are drawn in between the unit plans. A unit plan in the hotlink does not have the demising wall included. The unit plan is from face of finish to face of finish. Demising walls are in the final plan. Should the corridor walls of the units also be in the final plan? They are currently in the hotlinked unit plans.
We are also using hotlinked bathrooms into the unit plans. The walls of the bathroom should not connect to the surrounding walls of the demising or corridor as those are rated.
I know this can all be achieved. I just need to figure out the layer settings of the Layer Set group.
I am finding that if the layer number for the hotlink does not match with the walls of the final plan, such as the corridor from the unit plan hotlink file, meeting the demising wall, then they dont clean up. Yet i dont want the bathroom walls to clean up with the demising walls.
These would be walls which I do not want to clean intersect with fire rated partitions. I want the fire partition to look unbroken. I do not want the unrated intersecting walls to intersect as I want the plane of the gypsum of the fire wall to run past the connecting wall.
How do I control this when I have walls inside of hotlinks? I know about use of layer sets to save my layer priorities. Yet how to I have walls in my hotlinks on the same layer as my final plan which some are to clean up and others are not to clean up?
I have bathroom walls in a unit which I do not want to clean and I have walls for the corridor I want to clean with demising walls in the plans which are drawn in between the unit plans. A unit plan in the hotlink does not have the demising wall included. The unit plan is from face of finish to face of finish. Demising walls are in the final plan. Should the corridor walls of the units also be in the final plan? They are currently in the hotlinked unit plans.
We are also using hotlinked bathrooms into the unit plans. The walls of the bathroom should not connect to the surrounding walls of the demising or corridor as those are rated.
I know this can all be achieved. I just need to figure out the layer settings of the Layer Set group.
I am finding that if the layer number for the hotlink does not match with the walls of the final plan, such as the corridor from the unit plan hotlink file, meeting the demising wall, then they dont clean up. Yet i dont want the bathroom walls to clean up with the demising walls.
Terrence Sturm, Architect
_______________
MBP OSX 10.15.4 Quad Core Intel i7 2.2hz
AC 17 build 5019
AC 22 build 7000
AC 23 build
AC 24 build 5000
_______________
MBP OSX 10.15.4 Quad Core Intel i7 2.2hz
AC 17 build 5019
AC 22 build 7000
AC 23 build
AC 24 build 5000