Hi,
I have an expression giving me a CO2 weight for my elements. The unmerged schedule shows all elements and their CO" weight correctly and the total for all the elements is correct. When I merge the schedule the CO2 is not summarized per row...however the total sum is correct. Is it possible to get a summarized quantity per element? Obviously AC knows it's there somewhere since the total sum is correct...
Br,
Mats
Attachments
2021-05-03_20-22-13.jpg
2021-05-03_20-22-13.jpg (124.8 KiB) Viewed 195 times
Last edited by Mats_Knutsson on Tue May 11, 2021 6:03 pm, edited 1 time in total.
#325455
Not possible that I know of, Mats. ARCHICAD gets the right total because it adds each individual element, however collapsed, in the schedule. Or, you can think of it as AC multiplying the quantity (column not shown in your schedule) by the amount as it sums to get the grand total.

What you see is "by design", and has been mentioned a few times over the years, so perhaps worth making a wish. It would have to be some new functionality that would allow the summing of summable fields for merged elements in a single row - since the only sum function at present will present a new row with a total.
User avatar
By LaszloNagy
#325662
I think what would be great is an option in the Scheme Settings Dialog.
In the Schedule Fields panel, we should have a new button for each field (next to the Sort, Sum, and Flag buttons) that would specify whether we want to display the sum when uniform elements are merged. So, whether values are summed in a Schedule cell or not could be specified on a "Schedule field" level, and would not be a global setting for the whole generated schedule.
User avatar
By Mats_Knutsson
#325674
LaszloNagy wrote: Sat May 08, 2021 2:48 pm I think what would be great is an option in the Scheme Settings Dialog.
In the Schedule Fields panel, we should have a new button for each field (next to the Sort, Sum, and Flag buttons) that would specify whether we want to display the sum when uniform elements are merged. So, whether values are summed in a Schedule cell or not could be specified on a "Schedule field" level, and would not be a global setting for the whole generated schedule.
Top!